
Remodel
Bathroom Renovation in Spring, TX
Waterproofed, well-planned bathrooms built around how the room is actually used every morning.
Overview
BATHROOM RENOVATION DONE PROPERLY.
A bathroom is the smallest room in the house and the least forgiving. Every inch of tile sits on top of waterproofing, framing and plumbing that nobody sees, and shortcuts in those layers surface two winters later as soft grout and stained ceilings below. Our bathroom renovations in Spring and Greater Houston start under the finish, then work upward to the surfaces you touch.
Layout & Fixtures
We map plumbing walls before design gets far, so the layout you approve is the layout that can actually be built without moving a stack across the house.
Tile & Surfaces
Large-format wall tile, mosaic shower floors, quartz and natural stone tops, all set on flat, prepared substrates with planned grout joints and layouts that land full tiles where the eye goes.
Lighting & Electrical
Task lighting at the mirror, GFCI protection, updated exhaust and switching that separates the shower, vanity and fan.
Why Capital K
WHAT YOU GET WITH BATHROOM RENOVATION.
The standards we hold to on every project of this type.
Correct Waterproofing
Pans, curbs and wall assemblies are built to hold water before a single tile is set.
Real Storage
Vanity, niche and linen layouts planned around what the household actually stores.
Accessible Options
Curbless entries, blocking for grab bars and wider clearances where they are wanted.
Ventilation That Works
Exhaust sized and ducted to the exterior — critical in Houston humidity.
Pricing & Timeline
WHAT IT COSTS. HOW LONG IT TAKES.
Every property is different, so we price from a walk-through rather than a rate card — but the way we price and schedule never changes.
Typical Timeline
A standard hall bath typically runs two to four weeks once materials are on site; primary suites with custom glass and stone run longer.
- Free on-site consultation and written estimate — no charge and no obligation.
- Itemized scope with labour, materials and allowances listed separately.
- Fixed pricing for the approved scope; changes are only priced in writing.
- Payments tied to completed milestones, never paid all up front.
How We Work
THE SEQUENCE FOR THIS PROJECT.
Four stages, documented, so you always know what happens next.
Measure & Plan
Existing plumbing, framing and ventilation are documented and the new layout is drawn to fit them.
Demolition
Controlled tear-out with floor protection and dust containment through the path to the bathroom.
Rough & Waterproof
Plumbing, electrical, backing and the full waterproofing assembly are completed and inspected.
Tile & Finish
Tile, vanity, glass, trim and fixtures are installed, then the room is cleaned and walked.
Questions
FREQUENTLY ASKED.
A standard hall bath typically runs two to four weeks once materials are on site; primary suites with custom glass and stone run longer.
Related Services
OFTEN BOOKED TOGETHER.
Projects of this type usually touch the work below.
Serving Spring, The Woodlands, Klein, Tomball, Cypress and Greater Houston — see our Spring, TX service page.
Free Estimate
Planning a project in Spring or Greater Houston?
Tell us what you want solved. You will get a written scope, an itemized estimate and a straight answer about what the work involves.

